The Zimbabwe National Water Authority (ZINWA) wishes to
enter into a Joint Venture with selected registered companies with a minimum of
5 years experience in the design and installation of mini hydro power stations
for the feasibility study, design, engineering, manufacture, quality assurance
testing, supply,transportation to site, installation, testing, commissioning,
operation and maintenance of mini hydro power plants at I R selected dam sites. Tendersontime,
a leading business leading Tender
Notice Portals is the first agency to report this notification.
2. The power generated from the selected darn sites is a cleaner
renewable energy source that can be used in the following instances:
a) As an alternative
power source and supplementary power requirement for the operation of ZINWA
dams,
b)Supplying power to sectors of the population that at
present do not have power supply, and
c) To reduce
dependence on imported power and fuels.
3. Bidders should demonstrate their experience. financial
and technical capability to develop, install and operate mini hydro power
plants
4. Biddersshould submit the following as part of their
bids:
Traceable references,
Company Profile and Valid Tax
Clearance.
Interested bidders arc required to submit their bids in
sealed envelopes clearly marked 'MINI HYDRO DEVELOPMENT'. Sealed bids are to be
deposited in the tender box at the ZIN WA offices at the address shown below
before 10:00 am on or before r of February 2017. Interested bidders are invited
to attend the opening °like bids at 10:00am on the 2" of February 2017.
For further
details, please call on +91-9218088010, +91-9218540407 or email at info@tendersontime.com
or register on the website: http://www.tendersontime.com/register.php
Tendersontime,
the world's Procurement
Search Engine , would like to
inform all interested firms, joint ventures and companies who participate in
such projects, to use this opportunity and expand their business.
No comments:
Post a Comment